Implementation information
  • Investor: Teplárna Písek, a.s.
  • Implementation: 2018
  • Description: For the summer and transitional period and in connection with the emission requirements, the TPI a.s. – Samoty heat source was reconstructed. The existing steam source with five boilers fired by light heating oil was removed and a new natural gas-fired source using BOSCH technology with a rated output of 27 t of steam/hour was installed. An integral part of the delivery was building of the flue system and lining of the existing factory chimney stack of height 80 m using stainless steel lining of diameter 1300 mm.The boiler house control system was implemented in SIEMENS technology with SYSTHERM – WebHeatControl visualisation.