CHYTROST | TECHNOLOGIE | BUDOUCNOST
ZÁKAZNICKÝ ÚČET
STAV ONLINE VÝROBY
SYSTHERM s.r.o.
+420 377 241 177
E-mail:
info@systherm.com
E-mail:
servis@systherm.com
HOME
ABOUT US
SERVICES
OUR REFERENCES
NEWS
CONTACTS
Search for:
REALIZATION
Home
REALIZATION
References
SUPPLY STATION
INDUSTRIAL APPLICATIONS
REALIZATIONS
ALL
Hot water and steam pipes
Biomass boiler room
Gas-fired boiler rooms
Supply station
Reconstruction of the central heating and sanitation installations
Heat pumps
Heat distribution to the territorial units
CONTROL SYSTEMS
CLEVER ENERGY
ENERGY MANAGEMENT IN THE SCHOOLS
reference
sidebar
Gas-fired boiler rooms
/
REALIZATION
Residential complex Tulipa Třebešín
Gas-fired boiler rooms
/
REALIZATION
Hot water and steam pipes
/
REALIZATION
Transition of steam pipeline to hot water pipeline, Písek
Hot water and steam pipes
/
REALIZATION
Heat distribution to the territorial units
/
REALIZATION
Use of the Waste Heat of the Biogas Station in Kladruby u Radnic
Heat distribution to the territorial units
/
REALIZATION
Heat distribution to the territorial units
/
REALIZATION
Reconstruction of the heat management system in Svidník
Heat distribution to the territorial units
/
REALIZATION
Heat pumps
/
REALIZATION
Implementation of energy saving measures
Heat pumps
/
REALIZATION
REALIZATION
/
Reconstruction of the central heating and sanitation installations
The Institute for the Care of Mother and Child in Prague 4 – Podolí
REALIZATION
/
Reconstruction of the central heating and sanitation installations
REALIZATION
/
Reconstruction of the central heating and sanitation installations
Conversion of CZT of the Velebudice SŠT complex
REALIZATION
/
Reconstruction of the central heating and sanitation installations
REALIZATION
/
Supply station
Tipsport arena Prague 7
REALIZATION
/
Supply station
Heat distribution to the territorial units
/
REALIZATION
Modernisation of the CZT System in Přeštice Town (CZT = central heat source)
Heat distribution to the territorial units
/
REALIZATION
Load More