Implementation information
  • Investor: ČEZ Energetické služby, s.r.o.
  • Implementation: january 2018
  • Description: The technology of the 24 MW, PN 25, TS 160 °C exchanger station with an output temperature of up to 130 °C for the pressure separation of the CHS primary hot-water system, which is operated by Veolia Energie a.s.