Reconstruction of part of the steam-water system of the district heating system of the city of Liberec into a hot water system as part of the GreenNet III project.
In the period from 04/2024 to 10/2025, SYSTHERM s.r.o. carried out the delivery and installation of 35 SYMPATIK units with an output of 30 – 10,000 kW and the replacement of the existing steam pipeline with a hot water pipeline using pre-insulated technology DN25 – DN300 with a length of approximately 10,218 meters, as part of the first and second stage of project GreenNet III.






