Implementation information
  • Investor: Severočeská teplárenská, a.s. / Ústecký kraj
  • Implementation: 2017
  • Description: The realisation of this job order was done due to the existence of the end-of-life technology of the exchanger station at the Technical Secondary School – DVS SŠT Velebudice. The site of the current exchanger station is the future site of new teaching workshops, which shall be an integral part of the project, which includes the complete insulation of the school buildings. The newly installed SYMPATIK technology with a total output of 4,850 kW is used for heating purposes and heating of water in the school premises and adjacent workshops. Integral parts of the project heating savings were the installed individual mixing modules (12 items), which shall ensure the required temperature in the individual school areas and workshops. The entire project was implemented using the Schneider – TWIDO control system with transmission to the Severočeská teplárenská dispatch. To minimise the heat losses in the distribution system and the components, the removable DH Box insulation was used.